<output id="n5jjl"></output>

        <ruby id="n5jjl"><b id="n5jjl"></b></ruby>

            <ruby id="n5jjl"><b id="n5jjl"></b></ruby>

              <p id="n5jjl"></p>
              <p id="n5jjl"></p><del id="n5jjl"><b id="n5jjl"><thead id="n5jjl"></thead></b></del>

              產品展廳>>產品銷售>>辰工試井系列軟件>>水平井多段壓裂優化

              試井分析是獲得多段壓裂水平井動態參數的關鍵技術,通過這些參數就可以對多段壓裂的產能進行計算和優化。軟件采用解析和數值解兩種方法水平井多段裂縫進行優化。

              軟件包含低滲儲層建模技術可以解決低滲透儲層的井底壓力資料解釋分析及水平井多段壓裂不同時間產能評價;利用解析及數值求解技術最終形成算法穩定收斂的水平井多段壓裂產能評價計算程序;考慮到水平井多段壓裂的產能評價需要建立不同時間下井底流壓和地面產量之間的關系,采用GPU進行計算,提高計算速度。

              主要技術:

              低滲透試井及產能全歷史模擬新技術:提供低滲透測試(如DST及抽汲測試),全歷史模擬及擬合新技術,解決了勘探井資料利用率低問題。

              形成了水平井多段壓裂產能預測新技術:建立考慮非均質性的地層滲流方程,同時開展水平井多段裂縫的非均質性滲流方程的求解研究。

              形成用于非結構PEBI網格產能數值模擬計算方法,為水平井多段壓裂產能預測提供計算工具。

              基于組件的軟件架構設計,制定統一的通訊協議和數據接口,使組件可以方便的復用。

              圖1 添加了水平井多段裂縫 圖2 裂縫優化(不同裂縫條數一年生產的日常量變化)

              Products>>Products on Sale>>Chengong Well Testing Software Series>>Optimization of Multi-Stage Fracturing in Horizontal Wells

              Well testing analysis is the key technology to obtain the dynamic parameters of multi-stage fracturing horizontal wells, through which the productivity of multi-stage fracturing can be calculated and optimized. The software uses analytical and numerical solutions to optimize multi-fractures in horizontal wells.

              The software includes low permeability reservoir modeling technology, which can solve the interpretation and analysis of bottom hole pressure data of low permeability reservoir and the productivity evaluation of horizontal well multi-fracture in different time, and finally form the calculation program of horizontal well multi-stage fracturing productivity evaluation with stable convergence algorithm by using analytical and numerical solution technology. Considering that the productivity evaluation of multi-stage fracturing in horizontal wells needs to establish the relationship between bottom hole flowing pressure and surface production at different time, GPU is used to calculate and improve the calculation speed.

              Main technology:

              Low-permeability well testing and full-history simulation of production new technology: Providing low-permeability test (such as DST and swabbing test), full-history simulation and simulation new technology, and solving the problem of low utilization rate of the data of the exploration well.

              The new technology of multi-fracture productivity prediction of horizontal well is formed: The formation seepage equation considering the heterogeneity is established, and the solution of the heterogeneous seepage equation of the multi-fracture of the horizontal well is researched.

              Forming a numerical simulation calculation method for a non-structural PEBI grid production, and providing a calculation tool for the horizontal well multi-fracture production forecast.

              A unified communication protocol and data interface are developed based on the software architecture design of the component, so that the component can be easily reused.

              Figure1: Horizontal well multi-fractures are added Figure2: Fracture optimization (daily variation of production of different number of fractures in one year)
              99精品久久久久久久婷婷
                <output id="n5jjl"></output>

                    <ruby id="n5jjl"><b id="n5jjl"></b></ruby>

                        <ruby id="n5jjl"><b id="n5jjl"></b></ruby>

                          <p id="n5jjl"></p>
                          <p id="n5jjl"></p><del id="n5jjl"><b id="n5jjl"><thead id="n5jjl"></thead></b></del>